312) Work starts on woodshed floor at the
Squire's Tavern - May 2, 2007
Volunteer workers begin work on the woodshed floor at the Tavern. One section
of the woodshed already has a board floor and we want to build a similar floor in
the second section. The initial work involves digging out material and leveling
up the dirt floor so that the floor joists to be installed are at the same height
as the existing floor.

Photo above - Volunteers Mike Ream (at right) and Dave Ravasio (in shadows)
level up the dirt floor in the second section of the Tavern woodshed.