in

Browse by Tags

  • 121) Squires Tavern work party

    121) Squires Tavern work party - November 17, 2001 Volunteers cut and remove brush from the back yard of the Squires Tavern property.
    Posted to Work Log (Weblog) by Paul on 11-17-2001
  • 113) Squires Tavern work party

    113) Squires Tavern work party - October 31, 2001 The same crew (Walt Landgraf, Dave Ravasio, Charlie Lynes and Ozzie Murphy) remove more wall material from the second floor (entrance to the tavern room) and also repair the cellar door so that it will shut and stay closed..
    Posted to Work Log (Weblog) by Paul on 10-31-2001
  • 57) Work party

    57) Work party - May 23, 2001 Five volunteers work on the inside of the building cleaning floors, door and window trim. The water system is partially turned on. (Charlie Lynes working on the floors, Walt Landgraf, Dave Ravasio and Harriet Winchenbaugh washing doors and trim.).
    Posted to Work Log (Weblog) by Paul on 05-23-2001
  • 52) Work party

    52) Work party - May 9, 2001 Four volunteers put in a couple of hours at various jobs at the Squires Tavern, including more clean-up tasks inside, some brush cutting outside and removing grass from the stone walk leading to the north and west doors.
    Posted to Work Log (Weblog) by Paul on 05-09-2001
  • 49) Work party

    49) Work party - May 6, 2001 Six energetic volunteers work on cleaning up the building. Left over building materials are stored away for future use, junk and various other items belonging to the State DEP are removed and every room in the building is vacuumed. Two photos from the work day are shown below...
    Posted to Work Log (Weblog) by Paul on 05-06-2001
Page 2 of 2 (15 items) < Previous 1 2
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2020 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems