  • 149) Squires Tavern work party

    149) Squires Tavern work party - January 23, 2002 Volunteers photograph and record details of a bedroom partition and closet wall and then begin the process of removing them. This opens up the original ballroom, a very important room of the Tavern. It was hoped that the removal of the partition would...
    Posted to Work Log (Weblog) by Paul on 01-23-2002
  • 148) Squires Tavern work party

    148) Squires Tavern work party - January 19, 2002 Walt and Dave remove windows from the back ell and former bathroom area so that painter Dave Mercier can putty and prime them, and apply a finish coat of paint to the exterior wood surfaces. It is hoped that by the end of the winter, all windows will...
    Posted to Work Log (Weblog) by Paul on 01-19-2002
  • 140) Squires Tavern work party

    140) Squires Tavern work party - January 9, 2002 Volunteers burn the brush pile that has accumulated from clearing the back yard over the past couple of months. Work was also done in the south downstairs bedroom with the removal of a sheetrock interior wall. More work was done in the "stencil closet"...
    Posted to Work Log (Weblog) by Paul on 01-09-2002
  • 139) Squires Tavern work party

    139) Squires Tavern work party - January 2, 2002 A major discovery is made: old wall stencils are uncovered in a closet off the front kitchen. Research indicates that the stencils are possibly from about 1815. Evidence points toward the possibility that the closet area originally was a part of the front...
    Posted to Work Log (Weblog) by Paul on 01-02-2002
  • 135) Squires Tavern work party

    135) Squires Tavern work party - December 26, 2001 Volunteers go to work on taking down much of the first floor bathroom. One wall is removed, along with the bath tub, some pipes and the bath closet. Workers removed about 5 bushels of spruce cones, nut shells and insulation that had been left by squirrels...
    Posted to Work Log (Weblog) by Paul on 12-26-2001
  • 132) Squires Tavern work party

    132) Squires Tavern work party - December 19, 2001 Volunteers stacked brick on the porch and removed nails from damaged clapboards and stored the clapboards in the wood shed for woodstove fuel. Walt and Dave go to Shutesbury, MA to pick up a load of radially sawn pine clapboards to replace damaged clapboards...
    Posted to Work Log (Weblog) by Paul on 12-19-2001
  • 130) Squires Tavern work party

    130) Squires Tavern work party - December 14, 2001 Volunteers remove the outside flood light by office door and remove all wires and conduit pipes. The old electric hot water heater has been disconnected from the wiring so that it can be removed. Preliminary work on the bulkhead is done.
    Posted to Work Log (Weblog) by Paul on 12-14-2001
  • 128) Squires Tavern work party

    128) Squires Tavern work party - December 5, 2001 Volunteers wash, inspect and catalog most of the artifacts found during the archeological dig during October.
    Posted to Work Log (Weblog) by Paul on 12-05-2001
Page 15 of 19 (189 items) « First ... < Previous 13 14 15 16 17 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2020 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems