  • 126) Squires Tavern work party

    126) Squires Tavern work party - November 28, 2001 Volunteers work on the bulkhead entrances to the cellar and also tear out and remove most of the modern kitchen cabinets. Some electrical wiring is removed and work is started on the future bathroom. Scrape wood is saved for the wood stove that will...
    Posted to Work Log (Weblog) by Paul on 11-28-2001
  • 121) Squires Tavern work party

    121) Squires Tavern work party - November 17, 2001 Volunteers cut and remove brush from the back yard of the Squires Tavern property.
    Posted to Work Log (Weblog) by Paul on 11-17-2001
  • 118) Squires Tavern work party

    118) Squires Tavern work party - November 14, 2001 Volunteer workers remove nails from the ceiling of the back room and the front kitchen. Also, much of the remaining wall around the front kitchen fireplace is removed.
    Posted to Work Log (Weblog) by Paul on 11-14-2001
  • 115) Squires Tavern work party

    115) Squires Tavern work party - November 7, 2001 Volunteer workers removed modern ceiling in two downstairs rooms: the back room (present day kitchen) and the "front kitchen". Earlier in the week: Walt and Dave worked with Eugene Allen to hook up two sets of drainage pipes to the dry well...
    Posted to Work Log (Weblog) by Paul on 11-07-2001
  • 114) Squires Tavern contractor work

    114) Squires Tavern contractor work - Week ending November 3, 2001 Fantastic progress on many fronts during the week. Mike Cote has started to shingle the roof: he has removed the old shingles from the roof of the wood shed and has put on new red cedar shingles on about 40% of the wood shed. SCASCO has...
    Posted to Work Log (Weblog) by Paul on 11-03-2001
  • 113) Squires Tavern work party

    113) Squires Tavern work party - October 31, 2001 The same crew (Walt Landgraf, Dave Ravasio, Charlie Lynes and Ozzie Murphy) remove more wall material from the second floor (entrance to the tavern room) and also repair the cellar door so that it will shut and stay closed..
    Posted to Work Log (Weblog) by Paul on 10-31-2001
  • 112) Squires Tavern work party

    112) Squires Tavern work party - October 30, 2001 The crew along with backhoe assistance by Eugene Allen find the existing dry well on the north side of the tavern. Elevations are shot so that this dry well can be tied into the roof drainage system. Also three large tree stumps are removed from the back...
    Posted to Work Log (Weblog) by Paul on 10-30-2001
Page 16 of 19 (189 items) « First ... < Previous 14 15 16 17 18 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2020 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems