in

Browse by Tags

  • 266) Squires Tavern work party

    266) Squires Tavern work party - August 6, 2003 Volunteers Dave and Charlie worked on wall surface preparation and the installation of what is thought to have been an original partition near the second floor ball room. Walt and Fred inspected the now exposed floor boards in the front parlor and took...
    Posted to Work Log (Weblog) by Paul on 08-06-2003
  • 264) Squires Tavern work party

    264) Squires Tavern work party - July 30, 2003 Dave and Charlie complete the sheetrock work in the 1st floor room that will be the kitchenette.
    Posted to Work Log (Weblog) by Paul on 07-30-2003
  • 263) Squires Tavern work party

    263) Squires Tavern work party - July 23, 2003 A big crew of volunteers (Dave Ravasio, Charlie Lynes, Fred Warner, Ted Bachman and Paul Hart) complete the removal of the modern hardwood flooring in the front parlor. This exposes the original floor of yellow pine which is not in very good shape.
    Posted to Work Log (Weblog) by Paul on 07-23-2003
  • 261) Squires Tavern work party

    261) Squires Tavern work party - May 31, 2003 Walt Landgraf is assisted by Fazal Amin and Bill Fletcher (students in the 10th grade at Regional High School #7). They vacuum, wash and wax floors at the Squires Tavern. They also dust and complete some general cleanup in preparation for a couple of special...
    Posted to Work Log (Weblog) by Paul on 05-31-2003
  • 260) Squires Tavern work party

    260) Squires Tavern work party - May 23, 2003 Walt investigates some wiring circuits for planned renovation work. Charlie removes old tape from the stairway. Dave continues with the upstairs hallway conversion- today he is taping sheet rock.
    Posted to Work Log (Weblog) by Paul on 05-23-2003
  • 259) Squires Tavern work party

    259) Squires Tavern work party - May 14, 2003 Dave and Charlie continue to work on the upstairs hallway conversion, installing some wood moldings where the two ceiling levels meet. Walt and Ted install one of the first new lighting fixtures. Ted Bachman (at right) and Walt Landgraf install one of the...
    Posted to Work Log (Weblog) by Paul on 05-14-2003
  • 258) Squires Tavern work party

    258) Squires Tavern work party - April 23, 2003 Walt, Charlie and Ted paint first floor bathroom trim and window sash. Ted unpacks period lighting fixture replicas that have just arrived. Dave begins dismantling and upstairs closet that will not be retained in the final floor plan. Doug installs his...
    Posted to Work Log (Weblog) by Paul on 04-23-2003
Page 6 of 19 (189 items) « First ... < Previous 4 5 6 7 8 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2020 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems